With the gradual development of the construction market, container houses have been widely used in the construction industry, and they are used more and more widely. In the past, containers were only used for loading goods, especially in terminals, but many containers were converted into The construction site container mobile house, which has a very good application effect in the construction industry. However, the container house has been used for a long time, and maintenance work must be done well, so that it can be used for a longer time without problems. Then, what happens when the container house needs to be repaired?
What happens when the container house needs to be repaired?
1. The box door is deformed, not closed tightly, cannot be rainproof, and needs to be corrected and repaired;
2. The door hinge device is deformed or damaged and needs to be rectified or replaced;
3. The door lock should be repaired if it fails, and the lock rod, lock rod seat, lock tongue, handle, handle seat, pallet, card board and other damages need to be replaced;
4. The side panels, wall panels, door panels, top panels, and bottom panels of the box are partially damaged and need to be welded or excavated and welded after leveling;
5. Repair welding is required for open welding of welds;
6. When the paint is partially peeled off, it is necessary to remove the paint and rust before applying the anti-rust paint and the color-like top paint.
Only by always paying attention to the maintenance of container houses and paying attention to production is the fundamental foundation for the development and growth of an enterprise. After all, workers are the foundation for the development and growth of an enterprise.