Short Lead Time for Building Metal - Low price Metal building construction design large span single two story steel structure warehouse building – Vanhe

Short Description:


Product Detail

Related Video

Feedback (2)

It adheres on the tenet "Honest, industrious, enterprising, innovative" to acquire new solutions regularly. It regards shoppers, success as its very own success. Let us establish prosperous future hand in hand for portable hand washing station, tiny container house, Prefabricated Home, All products and solutions arrive with high quality and fantastic after-sales expert services. Market-oriented and customer-oriented are what we now have been being immediately after. Sincerely look ahead to Win-Win cooperation !
Short Lead Time for Building Metal - Low price Metal building construction design large span single two story steel structure warehouse building – Vanhe Detail:

2
图片2

1.Installation

Our new type steel structure is more convenient to install, 2,000 square meters can be completed within 1 week by 5 workers.

1) The main steel frames(structure) are all connected by high-strength bolts, no need on-site welding. Its’ installation is similar to building blocks.

(2) Totally 2 types of purlins will be used on roof and the walls of our Steel Structure.  (there are at least 4 types of purlins will be used on the roofing and walls by other manufacturers.)  So it can be constructed more easily without further distinction.

(3) The combination of Chemical bolt and chemical glue bans the complex steel cage foundation structure in traditional steel structures, making on-site construction more convenient. The columns are easier to align so that the steel structures are at the same level.

(4) The architectural installation drawings are easier to understand and can be installed in conjunction with theinstallation video, reducing the cost of assignments.

Materials: 

1. The main frame (columns and beams) is made of welded H-style steel. 

2. The columns are connected with the foundation by pre-embedding anchor bolt. 

3. The beams and columns, beams and beams are connected with high intensity bolts. 

4. The envelope construction net is made of cold form C-style purlins. 

5. The wall and roof are made of color steel board or color steel sandwich panels, which are connected with the purlin by Self-tapping nails. 

6. Doors and windows can be designed at anywhere which can be made into normal type, sliding type or roll up type with material of PVC, metal, alloy aluminum, sandwich panel and so on. 

2.Overseas Project

(Over than 2000+projects)

.Building  (2)

3.Steel Structure Customer Feedback

.Building  (3)

4.ADVANTAGES

1.Professional and efficient designer teams

2.Collectivize and large-scale production

3.Professional and efficient installation of the construction

4.International quality control system

.Building  (4)

5.Company

.Building  (5)

Products & Service Scope:
Design& Engineering service, steel building, space frames, portable cabins, tubular steel structures, basic building elements (built-up welded H-section, hot-rolled H-section, channel, steel column, steel beam), standard frames, secondary framing, roof & wall materials, temp-con (sandwich) panels

Market:
Over 16000 buildings delivered in the world! 

Products have been exported to Europe, Australia, North America, the Middle East, Africa, Asia and other countries and regions.

6.Packaging&Delivery

.Building  (6)


Product detail pictures:

Short Lead Time for Building Metal - Low price Metal building construction design large span single two story steel structure warehouse building – Vanhe detail pictures


Related Product Guide:

abide by the contract", conforms towards the market requirement, joins during the market competition by its good quality likewise as provides additional comprehensive and great services for customers to let them turn out to be big winner. The pursue of your enterprise, is the clients' fulfillment for Short Lead Time for Building Metal - Low price Metal building construction design large span single two story steel structure warehouse building – Vanhe , The product will supply to all over the world, such as: Turkey, Honduras, Sao Paulo, Our tenet is "integrity first, quality best". We have confidence in providing you with excellent service and ideal products. We sincerely hope we can establish win-win business cooperation with you in the future!
  • This enterprise in the industry is strong and competitive, advancing with the times and develop sustainable, we are very pleased to have a opportunity to cooperate!
    5 Stars By Rita from Johor - 2017.12.09 14:01
    The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
    5 Stars By Andy from Florence - 2017.11.29 11:09
    Write your message here and send it to us